This Victorian semi detached villa in the heart of Falkirk was re-slated at the rear low level elevations as Phase 1 of this project. The phased approach was to allow the planned extension to this gorgeous property to be carried out in a logical fashion and eliminating having to revisit this area of the roof with the rest being carried out at a later date when constructions works are complete.
Following the roof being stripped it was expertly reinstated with Grade ASpanish Kensington Slates, Code 5 Lead, Copper Nails, Zinc Ridges and Heavy Duty Ridge Strap, Protec VP400 Breather Membrane. Excellent project to be involved in in our hometown.